Annex 11 Revision and 21 CFR Part 11: What to Specify in Process Skid Automation

Oct 5, 2026 5 min read

Operator in cleanroom gown signing in at an HMI touchscreen mounted on a stainless steel process skid
Share

For fifteen years, the EU’s rules for computerised systems in GMP manufacturing sat in a five-page document: Annex 11, last revised in 2011. That is changing. In July 2025, the European Commission and PIC/S published a draft revision that grows Annex 11 to 19 pages across 17 sections. Consultation closed on 7 October 2025, and the final text is expected after that, with the date it comes into force to be set when it is published.

If your plant exports to the EU or UK, or supplies customers who do, this matters for every automated system on your floor, including process skids. And for plants supplying the US, 21 CFR Part 11 has set the rules for electronic records and signatures for years. This article looks at what both mean for the automation you specify on new process equipment.

What is changing in Annex 11

The draft is not a light update. The areas that grew most are security, identity and access management, qualification and validation, audit trails, and supplier management. Cybersecurity is treated as a core GMP requirement for the first time.

For process equipment, three changes stand out:

  1. Audit trails capture more. Under the draft, audit trails must record when data is created, not only when it is changed or deleted.
  2. Access is tied to the individual. Users should be identified individually, with access limited to what their role needs.
  3. Supplier documentation is in scope. Where a manufacturer relies on a supplier’s qualification work, the draft sets expectations for how that reliance is justified and documented.

The revision was drafted together with PIC/S, which means its influence is likely to extend beyond the EU to the many regulators that follow PIC/S guidance.

Part 11 and Annex 11 side by side

The two are not the same regulation, but for a process skid they point in the same direction.

Topic21 CFR Part 11EU GMP Annex 11 (draft revision)
Where it appliesFDA-regulated products for the US marketMedicinal products for the EU market
Core focusElectronic records and electronic signaturesThe whole lifecycle of computerised systems
Audit trailRequired for creation, modification and deletion of recordsExpanded, including data creation events
Access controlLimited to authorised individualsIndividual identity and role-based access, with more detail on security
SuppliersNot a main focusSpecific expectations for relying on supplier work

What this means for process skid automation

A process skid’s automation creates GMP data every time it runs: temperatures, weights, times, alarms, operator actions. Under both frameworks, that data has to be attributable to a person, protected from change, and available for review. In practice, that means your URS should ask clear questions about four things:

  1. Who can do what. Individual user accounts, role-based permissions, and no shared logins.
  2. What gets recorded. An audit trail that captures creation, change and deletion, with the time and the user.
  3. How records are kept. Electronic batch records, backup, and a tested way to restore them.
  4. What the supplier hands over. Documents that show how the system was designed, tested and qualified.

What Esteril’s automation delivers

Esteril designs automation for process skids, vessels and CIP/SIP systems, working with Siemens, Schneider, Allen Bradley and Mitsubishi platforms. Systems are built to USFDA 21 CFR Part 11 and GAMP 5 guidelines. Key features include:

  • PLC-SCADA open solution
  • HMI or IPC for centralised control
  • Electronic batch records (EBR)
  • Audit trail
  • Backup facility

Esteril’s electrical and automation team works with process specialists to design the automation sequences, so the control logic reflects how the process actually runs. More on our pharmaceutical automation and complex process skids.

Supplier documentation you can rely on

The draft Annex 11 gives more attention to how manufacturers rely on supplier work. That makes the supplier’s documentation package more important, not less. For every system, Esteril provides DQ, FAT, IQ, OQ and PQ protocols. FAT is carried out at Esteril’s dedicated testing facility before shipment. After OQ, Esteril hands over the final approved programmes and editable drawings, so your team is not dependent on the supplier to understand or maintain the system. Read our guide to FAT and SAT .

URS checklist for skid automation

URS itemWhat to ask for
User accessIndividual accounts, role-based permissions, password rules
Audit trailEvents captured, including creation, change and deletion, with user and time
Electronic signaturesWhere signatures are needed and how they are applied
Batch recordsEBR content and format
Backup and restoreBackup method, frequency and restore test
PlatformPreferred PLC and SCADA platform for your site
Validation documentsDQ, FAT, IQ, OQ, PQ scope, and FAT witness plan
HandoverFinal programmes and editable drawings after OQ

Frequently Asked Questions

Has the new Annex 11 come into force?

Not as of this article. The draft revision was published in July 2025 and consultation closed in October 2025. The date it comes into force will be set in the final text. Many manufacturers are using the draft as a checklist now rather than waiting.

Which PLC platforms does Esteril work with?

Siemens, Schneider, Allen Bradley and Mitsubishi.

Do we receive the programme after commissioning?

Yes. Esteril hands over the final approved programmes and editable drawings after OQ.

Talk to Esteril

Writing a URS for a new process skid? Send it to Esteril’s automation team for a review against 21 CFR Part 11 and GAMP 5. Contact our engineering team.