SIP and CIP skid systems with stainless steel piping, pressure gauges, temperature instrumentation and pharmaceutical cleaning equipment.
Share

An undersized CIP skid shows up in two ways. Either the spray device can’t wet the whole vessel, or the outlet line never reaches a velocity that scrubs the wall, and the cleaning validation runs fail. An oversized skid costs more, uses more WFI and chemicals, and takes longer to heat up than it needs to.

Sizing comes down to a handful of numbers you can work out from your P&ID before you speak to a supplier. This article goes through them in order, with a worked example at the end.

Step 1: List every circuit the skid will clean

A circuit is one path the cleaning solution takes: a vessel with its spray device and outlet, or a run of transfer lines. Write down each circuit, and for each one note the vessel size, the spray devices, the line sizes and the distance from the skid.

The skid has to serve the most demanding circuit, not the average one. One large vessel with a 2-inch outlet can set the pump size for the whole skid.

Step 2: Work out the flow the vessel needs

For vertical vessels with static spray balls, the usual guide is 2.5 to 3 US gallons per minute per foot of vessel circumference, which is about 31 to 37 litres per minute for each metre of circumference. For horizontal vessels and flat-topped tanks, flow is based on surface area instead, about 10 litres per minute per square metre.

Rotating and multi-axis spray devices need less flow at higher pressure. For these, use the device manufacturer’s figures rather than the rule of thumb.

Agitators, baffles and dip pipes create shadows the spray can miss. Each may need its own spray device, which adds flow.

Step 3: Work out the flow the lines need

Cleaning solution scrubs a pipe wall only when the flow is turbulent. Most CIP designers aim for at least 1.5 m/s (5 ft/s) in every line of the circuit. The flow needed depends on the line size:

Tube ODFlow for 1.5 m/s (approx.)
1 inch35 L/min
1.5 inch87 L/min
2 inch163 L/min
2.5 inch261 L/min
3 inch382 L/min

The vessel outlet line is often the one that sets the flow. If the spray device needs less flow than the outlet line, the outlet line wins, and the spray device has to be chosen to pass the higher flow at its working pressure.

Step 4: Size the supply pump

The supply pump must deliver the highest circuit flow at the pressure that circuit needs. That pressure is the sum of:

  • The pressure the spray device needs at its inlet. Static spray balls typically work at about 1.5 to 2.5 bar.
  • Friction losses in the supply line, fittings, valves and heat exchanger
  • The height from the skid to the spray device
  • Any extra length if the skid sits far from the vessel

Since circuits differ, a variable speed drive lets one pump hit the target flow on each circuit.

Step 5: Plan the return

Whatever goes into the vessel must come out at the same rate, or liquid pools in the bottom dish and the spray loses its cascade. Returns are handled by gravity, a return pump or an eductor. Each needs its own head loss calculation, and a return pump must be able to handle the air drawn in with the solution.

Step 6: Size the tank

The CIP tank must hold enough solution to fill the largest circuit while recirculating. That is the volume of the supply and return lines, the pump and heat exchanger, and the working level in the vessel bottom, plus a margin so the pump never runs dry. Final rinses with WFI or purified water are often single-pass and do not return to the tank.

A larger tank is not better. It uses more water, chemical and heating energy on every cycle.

Step 7: Size the heating

Caustic washes are usually run hot. The heat exchanger must bring the circulating solution and the steel it touches up to temperature in a reasonable time, and hold it there. Heating inline, with the flow bypassing the tank, keeps heat-up time short. Also check that the site drain can take hot water, and the full range of pH from the acid and caustic steps, at the highest circuit flow.

Step 8: Check the schedule, not just the hydraulics

If one skid serves several vessels, add up the cycle times. A skid that is hydraulically right but can only clean one vessel at a time may hold up production. Depending on the schedule, the answer may be a second fixed skid or a mobile one. Our article on mobile vs fixed CIP/SIP skids compares the two, and our guide to optimising CIP cycle times covers where time is usually lost.

Leave some headroom if more vessels are planned.

A worked example

This is an illustration of the method, not a design. Take a vertical vessel 1.5 m in diameter with one static spray ball and a 2-inch outlet line.

StepCalculationResult
Circumference3.14 x 1.5 m4.7 m
Spray ball flow4.7 m x 31 to 37 L/min per m146 to 174 L/min
Outlet line flow2-inch tube at 1.5 m/sabout 163 L/min
Design flowHigher of the two, with a small marginabout 180 L/min (10.8 m³/h)
Pump duty180 L/min at spray ball pressure plus line, fitting, heat exchanger and height lossesFrom the line layout

In this case the spray ball and the outlet line need similar flows, so both work at the same design flow. If the outlet were 3-inch, the line would need about 382 L/min, more than double what the spray ball needs, and the whole skid would grow with it. This is why the line sizes on the P&ID matter as much as the vessel size.

Once the skid is built, a riboflavin coverage test confirms the spray reaches every internal surface, and cleaning validation confirms the cycle removes residues to the agreed limits. Our article on cleaning validation for pharmaceutical equipment covers that next stage.

How Esteril sizes CIP/SIP systems

Esteril designs in-situ CIP/SIP systems, both built into vessels and as separate fixed or mobile skids, for pharmaceutical and biopharmaceutical plants. We size them from the client’s P&ID and production schedule, then run the system with water and its automation at our Vasai FAT facility before dispatch.

If you have a P&ID and want a second opinion on CIP sizing, send it to our engineers and we will check the circuits with you.

Frequently asked questions

What flow rate does a CIP skid need?

It depends on the most demanding circuit. For a vertical vessel with a static spray ball, allow about 31 to 37 litres per minute per metre of circumference. Then check that every line in the circuit reaches at least 1.5 m/s, and use whichever needs the higher flow.

What velocity is needed in CIP lines?

At least 1.5 m/s (5 ft/s) is the common design target, so that the flow is turbulent enough to scrub the pipe wall.

Can one CIP skid serve several vessels?

Yes, if it is sized for the most demanding circuit and the total cycle time fits the production schedule. Otherwise a second fixed skid or a mobile skid may be the better choice.

How big should the CIP tank be?

Large enough to fill and recirculate the largest circuit, including lines, pump, heat exchanger and the working level in the vessel bottom, plus a margin. Bigger than that only adds water, chemical and heating cost.